Town of Middlebury Improvement Projects
Various Improvements Projects: Stewart Lane, Rolling Acres, Charles Avenue, Chipman Park, Buttolph Drive, South Street, Dow Pond, Halpin Rd., Cady Rd.
Services: Final Design, Bid Phase & Construction Phase Services, Construction Oversight
Point of Contact: Mr. Dan Werner, Public Works Planning Director
Years: 2010-2020
Jamie Simpson has been working with the Town of Middlebury since 2010. Through various contracts ranging from water main replacements, stormwater improvements, culvert replacements, sewer main replacement to road reclamation and paving projects.
In 2011, he designed, drafted plans, oversaw construction and administered the Stewart Lane Improvements Contract which included water main replacement, sewerline replacement, stormwater improvements, road widening with new concrete curb and roadway reclamation. In the same year, he performed the same tasks for the Buttolph Drive Infrastructure Improvements project. In 2012 he assisted the Town with a new water main extension to Rolling Acres development and in 2013 assisted the Town with Resident Representative services for the Green Mountain Place Improvements project. In 2014 he redesigned, administered and oversaw construction for the South Street improvements project which included replacement of water main with new 12-inch ductile iron, a new 6-inch horizontal directionally-drilled (HDD) sewer force main, new gravity sewerline and manholes, stormwater improvements, road reclamation and paving.
In 2018 In 2020, Mr. Simpson assisted the Town with a water main replacement project on Case Street (VT 116) in conjunction with a VTrans Culvert Replacement project as well as a Culvert Replacement project on Cady Road that included a new Aluminum Structural Plate Pipe Arch design.